Clymb is designed to serve two main amusement activities: artificial wall climbing and indoor skydiving. The facility is built next to the Ferrari World’s on Yas Island, Abu Dhabi.
PROJECT TYPE
FACADE TYPE
COUNTRY
CREDITS:
DEVELOPER
Miral Asset Management
CONSULTANT
AECOM
CONTRACTOR
Zublin Construction LLC
SCOPE OF WORK:
– 800 Tons of custom designed steel structure composed of 68 Triangular shape mega size panels connected with articulated Nods.
– 7’000 sqm of cladding with Fire Rate insulated composite sandwich panels and Aluminum composite panels tested to NFPA-285.
– 6,000 sqm of Non-insulated FR A2 Triangular cladding panels in aluminum, perforated sheets and glazing
– 1,500 sqm of Glass fin structure, perforated Cladding panels and smoke vents for MEP areas.